Here’s an update on what we’ve been up to over the past few months!

Summer 2023 was a busy period for our teams but we’ve managed to complete, start and continue lots of new home renovations and refurbishments across South West London.

 

If you’re looking for home renovations, decorating, repairs or home extension work this Autumn & Winter, Red Box can help, give us a call on 0207 391 1539, our teams are preparing our schedules for the months ahead.

Here is an update on some of our key projects our teams have been working and that have been completed in the past 3 to 4 months!

In summer and early Autumn 2023 we completed work on:

In the Fulham (SW6) area, we’ve completed a new bathroom on Crabtree Lane. On Homestead road a New Magnate Kitchen has been installed after the kitchen was moved to another room in the house, there has also been electrical, plumbing work and general wall and door changes throughout the property. And On Waldermar Avenue we’ve fitted a new bathroom, updated electrics and full interior redecorating was completed.

In SW8 over on Richborne Terrace we fitted not one but two new bathrooms. In Sutherland Gardens SW14 there was also a new bathroom installed last month.  Whilst in Brunswick Gardens, W8, last month we completed full exterior decorating ready for the winter ahead!

In the West Kensington area (W14) we completed electrical and plumbing work before installing a brand new Wren Kitchen.  And on Cambridge Grove W6 we repainted the whole of the property and installed new flooring.

We’ve also fitted a few new Roundhouse kitchens over the past few months:

These included in Richmond on Vineyard Mews we also fitted new flooring, along with some structural work, plus electrical and plumbing updates.

Over on Ennerdale Road (TW9) along with the kitchen there was structural work completed  – plus new flooring and patio doors.

And on Suterhaldn Group(TW11) in Teddington we fitted underflooring heating and new flooring along side the Roundhouse kitchen.

On Hillcroft Crescent W5 we completed structural changes, installed underflooring heating, updated the electrics and decorated throughout and last but not least, further afield in the Harrow area we completed a full house refurbishment.

 

 

 

Chesson Road, West Kensington1
Sloane Square Roof Terrace renovated by RedBox 2
Wimbledon property gets a new kitchen 6
carpeted living room 2

As we continue into Autumn ahead of winter, we’re still working our way through these projects currently.

In W5 on Kings Road, we’ve been working on a complete house refurbishment, started earlier In 2023. Electrical work, plumbing work and roof repairs have been worked on already, with internal structural work already complete we were paused waiting for planning permission to start on the exterior changes .  As we head into autumn we start working on the exterior now permission granted, and full electrical rewiring.

In Chiswick High road W4 We’re building an extension now that a new architectural design as been agreed and we’re working on a complete refurbishment of a Mayfair apartment including retiling the bathroom, kitchen and roof terrace work amongst other updates.

Recently we’ve begun work on 4 projects including a new Roundhouse kitchen including:

In SW6 on Bishops Road the new kitchen, electrical and plumbing work and decorating has begun, and on Niton Street we currently working on exterior work and moved steps as part of the garden landscaping project, we’ll be working on glazing, electrical alongside the new kitchen.

More Roundhouse Kitchens going into Stanley Road, SW14  – along side structural changes, plumbing and electrical work, painting & decorating throughout plus installation of a new Howden’s Utility Room

Further a field the final new Roundhouse kitchen is being installed on Heathview Court in NW11, we’ll also be retiling, new skirting, new door and ironmongery installed, electrical & plumbing work  – which includes a brand new boiler plus painting & decorating throughout.

A full property refurbishment began in SW15 on Gwalior Road – including 3 new bathrooms, structural work, new wooden flooring installed, misting system fitting for fire safety and new glazing.

On Filmer Road, SW6 full interior & external decorating has begun alongside a brand new bathroom and electrical upgrades.

There’s also two new bathrooms going into Westfields Avenue, Sw13 with plumbing changes and upgrades.

Get ready for Winter ahead! We’re still working on our project schedule for the coming months, if you’re planning repairs, upgrades or decorating in the near future get in touch for a free quotation.

Waiting to begin in October & November we already have new bathroom installations on Clonmel Road SW6, Arundel Gardens W11, Waldegrave Road W5, and Westgate Terrace SW10 there’s two new bathrooms!

Contact us today via email or via telephone 020 7381 1539 for a free quotation for:

✓ Plumbing
✓ Electrical works
✓ Emergency roofing repairs
✓ Your kitchen or bathroom refurbishment
✓ Redecoration of all or part of your home
✓ External repairs or decorating
✓Loft conversions or Extensions
✓ Flooring inc underfloor heating installation
✓Structural work

and much more!