Top Projects of 2022: New Howden’s Kitchen installation in Raynes Park, SW20
We completed a full refurbishment of this property on Cottenham Park Road in Raynes Park, SW20. New kitchen, flooring and decorating throughout were included.
Next up on our 2022 project highlights, is a project over on Cottenham Park Road in Raynes Park, SW20
The project began in March 2021 and finished up in July 2022, and saw an installation of a new Howdens kitchen, new flooring, structural work and a brand newly built utility room.
In addition to the new kitchen, there were upgraded electrics, new flooring and new radiators installed. The project took some time due to the challenges we faced with existing plumbing and floor levels in the kitchen that had to be extensively modified.
The end result left the client especially happy with the new kitchen!
Work completed:
- Replacement kitchen
- New flooring
- New utility room
- New electrics
- Knocking through wall from kitchen to sitting room, blocking off wall and widening existing opening in kitchen
- Painting and decorating
- LVT flooring
- New internal fire doors
- New radiators
We work with some fantastic suppliers and products to complete our projects.
Products/Suppliers worked with to complete this project:
Kitchen: by Howdens – Chilcomb Porcelain
Sink: by Franke Ascona 1.5 Bowl Reversible Inset Stainless Steel Kitchen Sink
Worktop: by Slab Tech – Snowflake
Doors: Canterbury fire door by Doordeals. /Howden Thruxton 4 panel grained.
Flooring: Howdens Rigid Luxury Classic Light Oak Vinyl Flooring. SDH3696
Radiator: Stelrad Accord
Mirror: Infinity Illuminated Mirror
Challenges:
Some of existing plumbing and floor levels in the kitchen had to be extensively modified
Our favourite feature:
With the opening up of the kitchen it created more room and light to work in.
Project budget range:
£50K-£100K