Next up on our 2021 project we fitted and installed a new bathroom over in the Wimbledon Park area in Kingscliffe Gardens.  The project took only a month from August to September 2021 and the client was happy with the service and finished product!

Additional plumbing work to move the boiler/cylinder out of the bathroom to the loft was also handled to make more space in the new bathroom.

Work completed:

  • New bathroom
  • Moved boiler / cylinder out of bathroom to loft

We work with some fantastic suppliers and products to complete our projects.

Products/Suppliers worked with to complete this project:

Products/Suppliers worked with to complete this project:

Cabinets / vanity and basin from Ikea: Godmorgon and Hemnes / Odensvik

Iflo torino bath shower mixer

Iflo pop up bath waste

Iflo wetherley thermostatic mixer shower

Standard heating element + tee piece switch

Altecnic eclipse 15mm angled radiator valve
iflo 1 ¼ clicker basis waste
Space white gloss wall & floor tile
City stone beigne ceramic tile
Compact close coupled wc pan
Compact close coupled cistern
Vitra soft close seat
Iflo torino basin mixer no waste
Iflo apsley single panel

Trojan evolve bath
Halite 1700 front bath palace
Bath end panel

Challenges:

When we removed tiles from the walls we had to rebuild the walls as internal woodwork had become rotten with water ingress over the years

Our favourite feature:

We love the look of the Ikea basin and vanity unit.

We’ll be sharing more highlights from our top projects of 2021 on our social media and blog throughout February.