Red Box Top Projects of 2021: loft bathroom converted to shower room in Barnes
Next up on our 2021 project highlights we completed a bathroom changed to a shower room in a converted loft, under floor heating and a dual fuel towel rail installed.
The project took under 3 weeks to complete (1-19 December 2021) and left the owners happy with their new shower room fitted just in time for Christmas.
Work completed:
- Loft bathroom conversion – Bathroom to shower room
- Under floor heating installation
- Tiled flooring
- Dual fuel towel rail installed
We work with some fantastic suppliers and products to complete our projects.
Products/Suppliers worked with to complete this project:
Tiles by Mandarin Stone
Mirror by Sphere – 60 Mirror
Basin by Hyde – 2 Door / Matte Fiord
Handles: by Hyde – York Matte Black
Tap by Crosswater see link >
Towel rail by Crosswater see link >
Challenges:
Had to level the floor by replacing joists and subfloor.
Our favourite feature:
Those Mandarin Stone tiles are stunning!
We’ll be sharing more highlights from our top projects of 2021 on our social media and blog throughout February.